Skip to content
Heathcote School's building exterior in Danbury, the period school house, photographed by the school.

School Fit Out

School fit out, programmed around term dates

Fit out and refurbishment for schools and education settings, delivered when the buildings are empty and ready when they are not.

Photograph © Heathcote School

The service

School work has one unmovable constraint: the calendar. We fit out and refurbish classrooms, halls, offices and shared spaces for schools and education settings, programmed around term dates so the heavy work lands in the holidays and the site is handed back clean, safe and finished before the first bell.

Enquiries are answered within 24 hours, and school fit outs typically run 4 to 12 weeks depending on scope.

Cinema screen wall in the acoustically engineered Monitor Audio show unit
Monitor Audio · Commercial fit out
Demonstration lounge in the Monitor Audio show unit with fluted wall details and halo wall light
Monitor Audio · Finished to present

What we build

  • Classroom and teaching space fit out and refurbishment
  • Halls, libraries, offices and staff rooms
  • Washroom refurbishment
  • Decoration, flooring, joinery and repairs across the estate
  • Summer works programmes planned and delivered as one package

Safeguarding

A site a school can trust

Working in education settings demands more than a tidy site. Our teams work under SMSTS qualified site management with SMAS accredited health and safety (deemed to satisfy), are first aid trained, and operate strict segregation between works areas and any occupied parts of the site. Access, deliveries and hoarding are planned with the school office, and conduct standards are set for a school environment.

Proof

Education work we have delivered

  • Heathcote Prep School, Danbury, our most recent education project, completed in August 2026: the photographs and short film are below.
  • National Bakery School, a named education client: a commercial fit out for the place the country’s bakers train. Read the National Bakery School case study
  • A school renovation in Thurrock, an earlier education project: exactly this service.

Recent work

Recently at Heathcote Prep School

Our most recent education project: works at Heathcote Prep School in Danbury, completed in August 2026. The photographs and short film below are our own team on site, in Madisons uniform.

A Madisons operative measuring and marking a board on the saw bench during works at Heathcote Prep School, Danbury.
A Madisons operative in the company polo shirt at work on site at Heathcote Prep School, Danbury.
Two of the Madisons team talking by the garden gate on site at Heathcote Prep School, Danbury, one in a hi-vis vest and one in the company polo shirt.
Two smiling Madisons team members on site at Heathcote Prep School, Danbury, one in a hi-vis vest and one in the company polo shirt.

FAQ

Answers from the Madisons team, led by Craig Bellamy, founder and director. Last checked 27/09/2026.

Can you complete the work during the school holidays?

That is how we prefer to programme it. Summer works are scoped and priced in the spring, materials are ordered against the holiday window, and the programme is built backwards from the first day of term. Where work must run in term time, it is phased and segregated so teaching carries on undisturbed.

What safeguarding and site standards do you work to?

SMSTS qualified management, SMAS accredited health and safety, a first aid trained team, and full segregation of works areas from pupils and staff, with access and conduct rules agreed with the school before anyone arrives. Insurance cover is £5m public liability, £10m employers liability and £1m professional indemnity.

Which schools have you worked for?

Our education clients include the National Bakery School and, most recently, Heathcote Prep School in Danbury, where our works completed in August 2026. Our earlier work includes a school renovation in Thurrock. The same commercial teams fit out 1,000 to 1,200 homes a year for national housebuilders, so a school programme sits well within our capacity.

How much does a school fit out cost?

Every programme is priced against a written scope with one transparent quotation, so bursars and business managers can compare like for like. Our projects start from £25,000, and school fit outs typically run 4 to 12 weeks, priced and programmed around the holiday windows.

Can you handle smaller repair and decoration work across the estate?

Yes, bundled properly. Decoration, flooring, joinery and repairs across the estate are usually gathered into one summer works package, scoped in the spring and delivered in the holidays, which is how smaller jobs get done to the same standard, and the same accountability, as the big ones.

More answers to common questions are on our FAQ page.

See also

Enquiries

Plan the next holiday works now

Education enquiries are answered within 24 hours.

Email [email protected]

Contact us