The short answer

The RIBA stages are the eight steps of the RIBA Plan of Work, numbered 0 to 7, that take a building project from first idea to use. For a home project they run from defining what you want, through design, planning and building regulations, to construction and handover, with planning usually applied for around Stage 3.

Architects, engineers and builders all use these numbers, so it helps to know what they mean before you hear “we are at Stage 4”. Here is each stage in plain words, where planning permission and building regulations fall, and how a design and build route brings the stages under one roof.

Key takeaways

  • The 2020 RIBA Plan of Work has eight stages, numbered 0 to 7, from strategic definition to use.
  • Planning permission is usually applied for around Stage 3, and building regulations drawings follow in Stage 4.
  • Planning permission and building regulations approval are separate, and you normally need both for an extension.
  • You do not have to appoint an architect for every stage, and small projects use the stages in a lighter form.
  • Keeping the order clean, with approval before the engineering and tender pack, avoids paying for design twice.

What are the RIBA stages?

The Royal Institute of British Architects (RIBA) publishes the Plan of Work, a framework for organising the briefing, design, construction and operation of building projects. In its own words on its Plan of Work page, RIBA says the framework organises that process into eight stages. The 2020 edition numbers them 0 to 7.

The names of the stages, as listed by Designing Buildings, are strategic definition, preparation and briefing, concept design, spatial coordination, technical design, manufacturing and construction, handover, and use. The table below puts each one in homeowner terms.

What happens at each stage, in plain words?

The eight RIBA stages from a homeowner’s point of view
StageNameWhat it means for you
0Strategic definitionYou decide that building work is the answer and what you want it to achieve
1Preparation and briefingThe brief is written: what you need, your budget, the site and the timing
2Concept designThe first layouts and options are drawn and one is chosen
3Spatial coordinationThe chosen design is developed in detail, and a planning application is usually made
4Technical designConstruction drawings and engineering are completed, and building regulations are dealt with
5Manufacturing and constructionThe building work is carried out on site
6HandoverSnagging, documents and final sign-off before you move back in
7UseYou live with the building, and any lessons or defects are picked up

Stages 0 and 1 are where many homeowners spend time without realising they are “in” a stage. Writing down what the extension must do, and what you can afford, is Stage 0 and 1 work, and it makes every later stage cheaper. The Planning Signal guide to the work stages notes that for most homeowners Stage 0 happens informally.

A plain, dated bedroom at Cold Norton as bought, bare boards and an old radiator under the window.
A plain, dated bedroom at Cold Norton as bought, bare boards and an old radiator under the window: the starting point of a project, before any brief is written.

Where do planning permission and building regulations fall?

Planning permission is usually applied for around Stage 3, once the design is developed enough to show a planning authority what you propose. Building regulations come after that, at Stage 4, when the drawings are detailed enough to show how the work will be built. Designing Buildings notes that the 2020 edition introduced different approaches to the timing of planning applications, so the exact stage can vary from project to project.

The two are separate approvals. The Planning Portal says plainly that building regulations approval is a separate matter from obtaining planning permission for your work. Planning is about whether the development suits the area; building regulations are about whether it is built safely and to standard. Our guides to planning permission for an extension and planning an extension step by step cover both in more detail.

On building regulations there are two routes. The Planning Portal describes full plans as the most detailed option, with decisions usually made within five weeks. It says a building notice is often used for smaller projects where the regulations are less complex, and that work can begin as soon as the notice is accepted.

Watch out

Planning permission does not cover building regulations, and a building notice does not replace planning permission. Check with your local planning authority and building control before any work starts.

Why does the order of the stages matter?

Because each stage builds on the one before, and changes get more expensive the later they arrive. Craig Bellamy, founder of Madisons, makes the point in his film on whether planning should be approved before you ask for prices: “An engineering pack you don’t really want to pay for until the build has been approved”. His reasoning is that an engineer might come back with a change, and that then costs you on the engineering again.

His recommended sequence maps neatly onto the stages: “just keep it as a clean process: architect, planning submission, approval, engineer, take the whole pack, hand that out, tender to the builders”. In RIBA terms that is design and planning through Stage 3, then the engineering and technical pack of Stage 4, then tender ahead of Stage 5.

Watch the film with its transcript: Should planning be approved before I ask for prices?

Tip

When you ask builders for prices, give each one the same Stage 4 pack, so you are comparing like with like. Our guide to when you need a structural engineer explains what the engineering part of that pack contains.

Do you need an architect for every stage?

No. The Planning Signal guide lists common packages: Stages 1 to 3 for design and planning permission only, Stages 1 to 4 through to building regulations and tender, and Stages 1 to 6 as a full service, which it recommends for larger projects. You choose how much of the process to buy in.

Many homeowners also ask whether they need an architect at all. Craig answers that in his film on whether you need an architect for an extension: “We work with two or three architects all the time”. He adds that Madisons can manage the whole process from start to finish. For smaller jobs, an architectural technologist may be the better fit.

How does a design and build route use the stages?

With a traditional route you appoint a designer, then a builder, and the stages run one after another with a handover of responsibility at tender. On a design and build project, one company looks after the design, approvals and construction under one contract, so the early stages and the build can be planned together.

Craig describes the benefit at the end of his planning film: “Let’s start a design and build process where we can look after you from the start.” Budget is part of it too. He says that means looking at budgets and building “a project and planning award around what fits your budget”. It is how we run our house extensions.

The ridge of the redesigned Brentwood roof mid tiling, membrane and battens still exposed above the new plain tiles, under the scaffold's temporary roof.
The ridge of the redesigned Brentwood roof mid tiling, membrane and battens still exposed above the new plain tiles, under the scaffold’s temporary roof: the construction stage.

The stages do not disappear on a design and build project. The drawings, planning, building regulations and construction all still happen. What changes is who coordinates them, and that the build team can advise on buildability before the design is fixed.

Do small projects use the RIBA stages?

In a lighter form, yes. A single storey extension, a kitchen refit or a knock through still goes from idea, to brief, to drawings, to approvals, to building work and handover. Few people call it Stage 3 or Stage 4, but the order is the same, and skipping ahead is where problems start: builders pricing without drawings, or work starting before approvals are in place.

Treat the stage names as a checklist. Before you ask for prices, ask yourself whether the brief, design, planning position and technical drawings are all settled. Before you sign off, ask what snagging, documents and certificates you will receive at handover.

Dining area in the Billericay rear extension with sliding doors onto the garden
Dining area in the Billericay rear extension with sliding doors onto the garden: the finished result at handover.

Sources and further reading

Frequently asked questions

What RIBA stage is planning permission?

Planning permission is usually applied for around Stage 3, spatial coordination, once the design is developed enough to show a planning authority what you want to build. The 2020 Plan of Work allows the timing of planning applications to vary, so on some projects it is sought earlier, and building regulations follow later at Stage 4.

How many RIBA stages are there?

There are eight, numbered 0 to 7: strategic definition, preparation and briefing, concept design, spatial coordination, technical design, manufacturing and construction, handover, and use. This is the 2020 edition of the RIBA Plan of Work. Stage names have changed between editions, so check which version a document refers to.

Do small projects use the RIBA stages?

Usually in a lighter form. A single storey extension or a kitchen and bathroom refit still moves from brief to design, approvals, technical drawings, building work and handover, but you will rarely see the stages named. An architect may be appointed for only some of them, for example design and planning without site inspections.

Do I need to appoint an architect for every RIBA stage?

No. Architects commonly offer packages that cover only the early stages, such as design and planning permission, or run on through building regulations drawings and tender. Appointing someone for the construction stage as well is a choice, and is more common on larger or more complex projects.

Related service

Design and Build

Craig Bellamy, founder of Madisons Commercial Solutions, laughing on site in navy work clothing

About the author

Craig Bellamy

Founder and director, Madisons Commercial Solutions

Craig Bellamy founded Madisons Commercial Solutions in 2009 and today leads it as a design and build company based in Latchingdon, Essex. He has 33 years in the industry, much of it delivering show homes for the UK’s leading developers. He is SMSTS qualified and personally oversees the interior finishes on every Madisons project. In May 2025 he spoke at Grand Designs Live.

Enquiries

Tell us what you have in mind

Call 01245 330103 or email [email protected]. We respond to every enquiry within 24 hours.

Get a quote